PROJECTS

OUR HISTORY

J&C TROPICALS

MIAMI - USA

Project Challenge:  Cold storage facility was using metal halide and fluorescent fixtures as their lighting technology and this was causing them excessive expenses in energy for lighting and cooling.

Solution: Custom made fixtures were engineered for the refrigerated areas utilizing the existing housings for the old light fixtures. High efficiency LED high bays and panels were installed in the common areas.

Results: Energy savings of up to 65% on premises using LED technology & thermal efficiencies from reduced heat emitted by the new fixtures. Real time energy consumption monitoring of their lighting system within the cooling units.     

INFINITO APARTMENTS

CARTAGENA – COLOMBIA

Project Challenge: New, high-end residential building wanted high performance fixtures that also had a high standard of aesthetic design for their exterior facade.

Solution: Custom lighting fixture was developed and installed to meet the precise needs of the project.

Results: A properly illuminated, eye catching facade to maintain the building's status and the benefits of having LED fixtures installed.

SOCCER STADIUM

MONTERIA - COLOMBIA

Project Challenge: Professional soccer matches could not be televised at night due to inadequate lighting levels.

Solution: Deployed sport lights with optimized distributions so that we could increase the level of horizontal lighting necessary for the TV cameras stream the match.

Results: Jaguares de Cordoba professional soccer team is now streaming live matches with appropriate light levels and energy efficient LED technology.

JOHN RESTREPO DISTRIBUTION CENTER

MEDELLIN - COLOMBIA

Project Challenge: Client was spending too much money on old replacement parts, maintenance costs and electricity to power lighting of the operation.

Solution: Vapor tight LED luminaires replaced their Metal Halide high bay fixtures.

Results: Energy savings of 63%, higher levels of lighting within the workspace and very positive feedback from operational staff.

COVIANDES TUNNEL BOGOTA TO VILLAVICENCIO

COLOMBIA

Project Challenge: 18 tunnels connecting two major cities where consuming far more energy than needed due to outdated lighting technologies.

Solution: With a structured turn key process and alignment with our partners, over 5,000 fixtures were changed from HPS to LED, in a project that lasted 4 years.

Results: Energy cost of lighting reduced by 40%, lower O&M due to less replacements of lighting components, improvement of their lighting levels to assure the safety of those driving through and considerable environmental impact improvements.

COAL SHIPLOADER

CERREJON - COLOMBIA

Project Challenge: Coal mine port and shiploader where consuming too much energy to light their loading operations. In addition, maintenance to fixtures on this locations are prohibitively expensive as they must shut down the entire line and follow strict safety protocols.

Solution: Wet location & explosion proof LED fixtures installed across the site.

Results: Longer life product allowed for minimum operation disruption due to maintenance and fixture failure, plus average savings of 55% on our clients energy consumption.

MINING MACHINERY WORKSHOP

CERREJON - COLOMBIA

Project Challenge: Coal mine operating in difficult environmental conditions was using obsolete HPS lighting technology consuming far more energy than what they needed.

Solution: Facility wide installation of optimally distributed, LED 520W fixtures designed for extreme conditions.

Results: Nearly 50% energy consumption savings, significant maintenance cost reduction and improved lighting levels.

HIDRAULICS LAB

MEDELLIN - COLOMBIA

Project Challenge: New engineering lab at local university required a solution that could provide high levels of lighting for lab related work despite fixtures needing to be installed at 40’ height ceilings.

Solution: Installed industrial LED fixtures with optimal lenses to efficiently distribute the light across the space despite the excessive ceiling height.

Results: Ideally lit space has been successfully used to develop high profile engineering projects within the university.         

POSTOBON PRODUCTION SITE

MALAMBO - COLOMBIA

Project Challenge: Exporting DC facility on a soft drink factory was wasting too much money on energy expenses for lighting.

Solution: Replaced the existing system with LED vapor tight fixtures that met specifications to ensure the right performance as per customer needs.

Results: 52% energy consumption reduction at the site with a 3 year ROI.

HOMECENTER DISTRIBUTION CENTER

BOGOTA - COLOMBIA

Project Challenge: Design and lighting supply for the largest distribution center in Bogota with over 3,000 fixtures across all sites.

Solution: Working in hand with our multiple trusted partners, we delivered multiple high tech efficient LED solutions to the company such as Wall packs, Industrial fixtures, Downlights and more.

Results: Delivered 64% in energy savings with multiple technologies and manufacturers.

GRUPO EXITO NATIONWIDE RETROFIT

BOGOTÁ - COLOMBIA

Project Challenge: Deliver instant savings to one of the biggest companies in the country, by executing a retrofit in all their major stores nationwide.

Solution: Change fluorescent tube fixtures with plug and play LED tubes in order to reduce capital investment, continue to use existing fixtures, lower installation costs and reduce energy demand.

Results: 60% in energy savings related to kWh consumption and an impressive O&M cost reduction throughout the project.

IEB OFFICE SPACE

MEDELLIN - COLOMBIA

Project Challenge: Retrofit project for an engineering firm located in Medellin with specific technology requests and large savings potential.

Solution: Design and execution of custom made project using LED pan Change fluorescent tube fixtures with plug and play LED tubes in order to reduce installation costs.

Results: 60% in energy savings related to kWh consumption and an impressive O&M cost reduction throughout the project.      

WASHING STATION

CERREJON - COLOMBIA

Project Challenge: Increase lighting levels for the industrial machinery washing station within a large open sky mining operation in northern Colombia.

Solution: Designed lighting system based on water proof, pole mounted LED fixtures at heights of over 50'.

Results: Upgrade of lighting levels across the site while lowering O&M expenses and assuring the safety and positive feedback from the operators.